Some of Our Latest Work
At Enriquez Roofing Inc., we help individuals and businesses with our top of the line services. Since starting out, we’ve taken on a variety of projects, always providing personalized attention to ensure precision and satisfaction with all of our work. Take a look at our recent projects and get in touch today to start your own.

El Moro - Brea
Remove 4 existing layers, replace damaged wood, install synthetic underlayment, and Certainteed Landmark Solaris

Coveview Dr. - Rancho Palos Verdes
Remove flat tile and add shingles for Tesla installation.

Hill St - Long Beach
Remove 2 existing layers, replace damaged plywood, install UDL 30, and Owens Corning Mountainside as a final finish.

Venice - California
Install new Owens Corning Duration Cool (Sierra Gray) and GAF Timberline HDZ (Birchwood)

South Gate - Santa Ana
Install ice and water barrier on roof and S tile as a final finish.

Northridge - Calahan
Tile tear off. Installation of new drip edge, ice and water barrier, synthetic underlayment (UDL-50), new Owens Corning Duration Cool Plus and ridge cap.

McCully - Chino
Re-roof with 1" ISO and install JM TPO 60 mil single ply.

Comiso Way - Rancho Cucamonga
Customer was tired of having to replace broken tiles so granulated torch down was installed.

Benson - Chino
Re-roof with 1" ISO and install JM TPO 60 mil single ply.

South Gate - Alexander
Shingle overlay; Install synthetic underlayment, new edge metal, and Certainteed Landmark Solaris

Whittier - La Vela
Double underlayment installed with Certainteed Presidential Solaris installed as a final layer. Skylights properly flashed and installed.

Hermosa Beach - Hermosa Ave
Install 1/4" densdec with screws and insulation plates. Then install TPO 60 mil single ply as a final finish.

Candlewood - Lakewood
Base sheet installation with metal cap nails, 1/4" strip of smooth installed around perimeter and flashings, granulated torch down installed as a final layer.

Irvine - Church Sheds
New drip edge metal installed, synthetic underlayment, and starter strips. Malarkey Ecoasis Nex installed as a final layer with ridge cap.

Louise - Long Beach
Removal of 2 existing layers. Installation of new drip edge, ice and water, synthetic underlayment, starter strips, and Malarkey Ecoasis Nex.

Toscanini - Rancho Palos Verdes
2 layer tear off. Installation of new drip edge, ice and water barrier, synthetic underlayment (UDL-50), new Owens Corning Duration Cool Plus and ridge cap.

9th St - Santa Monica
Remove existing rock build up roof. Install 1" ISO and install JM TPO 60 mil single ply.

San Francisco - Long Beach
Remove existing damaged wood, skylights, and roof. Replace damaged plywoods and install new granulated torch down.

Val Verde - Long Beach
Remove 2 layers of wood shake, install new radiant barrier plywood, and Malarkey Ecoasis Nex shingles.

Corydon St. - Compton
Remove 1 layer of wood shake, and 3 layers of asphalt shingles. Iinstall new radiant barrier plywood, and install Owens Corning Duration Cool shingles.
3 layer tear off. Installation of new drip edge, ice and water barrier, synthetic underlayment, new Certainteed Landmark Solaris and ridge cap.

Tia Juana - Laguna Beach
Remove existing rock build up roof and 1" ISO. Install 2.5" ISO and install Certainteed granulated torch down.
Tile relift; Installation of new double underlayment and reinstallating existing tile.

Bryant Dr - Huntington Beach
Installation of new drip edge, ice and water barrier, synthetic underlayment, new Certainteed Landmark Solaris shingles and ridge cap.

Wilson St - Costa Mesa
Tear off of 1 layer of shingles. Installation of new drip edge, ice and water barrier, synthetic underlayment, new Malarkey Ecoasis Nex and ridge cap.

Beach St - Watts
Tear off of 4 layer of shingles, and 1 of wood shake. Install new 1/2" radiant barrier plywood. Install new drip edge, ice and water barrier, synthetic underlayment, and new Owens Corning Duration Cool and ridge cap.

66th St - Los Angeles
Tear off of 2 layer of shingles. Install new drip edge, ice and water barrier, synthetic underlayment, and new Certainteed Landmark Solaris and ridge cap.

Grevillea - Lawndale
Tear off of 1 layer of shingles. Install new drip edge, ice and water barrier, synthetic underlayment, and new Malarkey Ecoasis Nex and ridge cap.

Whittier - Groveside
Tear off of 3 layers of shingles. Install new 1/2" radiant barrier plywood. Install new drip edge, ice and water barrier, synthetic underlayment, and new Certainteed Landmark Solaris and ridge cap.

Westminister - Beach Blvd
Remove existing sheet metal roof with silicone coating. Install 1.5" ISO and install TPO single ply 60 mil.

Baruna Ln - Huntington Beach
Remove existing rock build up roof. Install 1.5" ISO and install TPO single ply 60 mil.

Long Beach - Doidge
Remove 5 layers of granulated torch down. Install new glass base, smooth and polyfresko torch down.

Redlands - Center Ave
Install drip edge, ice and water barrier, synthetic underlayment, and GAF HDZ RS shingles matching existing roof on ADU.

Yorba Linda - Mt Hood
Install double 30 lb underlayment, and duralite saxony 600 tile matching existing home with 2 low profile vents.

Torrance - Andreo
Install drip edge, ice and water barrier, synthetic underlayment, and Certainteed Landmark Solaris shingles matching existing roof on ADU.

Long Beach - Lime St
Remove 2 layers of existing roof. Install a custom cricket system to help with water flow. Install base sheet, smooth and cool roof torch down.

Long Beach - Rose
Remove 2 layers of existing roof. Install 1/2" radiant barrier plywood. Install synthetic underlayment. Install Owens Corning DC shingles.

Long Beach - Caspian
Install shingles on top of existing roof. Install drip edge, synthetic underlayment. Install Owens Corning DC shingles.

Long Beach - Linares
Remove existing wood shingles roof. Install 1/2" radiant barrier plywood, install new edge metal with synthetic underlayment/ice and water. Install new Owens Corning DC shingles.

RPV - Pirate Dr.
Install drip edge, ice and water barrier, synthetic underlayment, and GAF HDZ RS charcoal shingles.

Whittier - Firebird
Remove 1 layer of shingles. Install drip edge, ice and water barrier, synthetic underlayment, and Malarkey Moonlit black shingles.

Long Beach - MLK
Remove 1 layer of existing roof. Install drip edge, ice and water barrier, synthetic underlayment. Install Owens Corning DC shingles.

Long Beach - Rose
Remove 1 layer of existing roof. Install drip edge, ice and water barrier, synthetic underlayment. Install Owens Corning DC shingles.

Long Beach - Rose
Remove 1 layer of existing roof. Install drip edge, ice and water barrier, synthetic underlayment. Install Owens Corning DC shingles.

Lakewood - Spahn
Install shingles on top of existing roof. Install drip edge, synthetic underlayment. Install Owens Corning DC shingles.

Whittier - Grady
Install shingles on new ADU. Install drip edge, synthetic underlayment. Install Certainteed Landmark Solaris shingles.

Long Beach - Linares
Remove existing wood shingles roof. Install 1/2" radiant barrier plywood, install new edge metal with synthetic underlayment/ice and water. Install new Owens Corning DC shingles.

El Moro - Brea
Remove 4 existing layers, replace damaged wood, install synthetic underlayment, and Certainteed Landmark Solaris

Coveview Dr. - Rancho Palos Verdes
Remove flat tile and add shingles for Tesla installation.

Hill St - Long Beach
Remove 2 existing layers, replace damaged plywood, install UDL 30, and Owens Corning Mountainside as a final finish.

Venice - California
Install new Owens Corning Duration Cool (Sierra Gray) and GAF Timberline HDZ (Birchwood)

South Gate - Santa Ana
Install ice and water barrier on roof and S tile as a final finish.

Northridge - Calahan
Tile tear off. Installation of new drip edge, ice and water barrier, synthetic underlayment (UDL-50), new Owens Corning Duration Cool Plus and ridge cap.

McCully - Chino
Re-roof with 1" ISO and install JM TPO 60 mil single ply.

Comiso Way - Rancho Cucamonga
Customer was tired of having to replace broken tiles so granulated torch down was installed.

Benson - Chino
Re-roof with 1" ISO and install JM TPO 60 mil single ply.

South Gate - Alexander
Shingle overlay; Install synthetic underlayment, new edge metal, and Certainteed Landmark Solaris

Whittier - La Vela
Double underlayment installed with Certainteed Presidential Solaris installed as a final layer. Skylights properly flashed and installed.

Hermosa Beach - Hermosa Ave
Install 1/4" densdec with screws and insulation plates. Then install TPO 60 mil single ply as a final finish.

Candlewood - Lakewood
Base sheet installation with metal cap nails, 1/4" strip of smooth installed around perimeter and flashings, granulated torch down installed as a final layer.

Irvine - Church Sheds
New drip edge metal installed, synthetic underlayment, and starter strips. Malarkey Ecoasis Nex installed as a final layer with ridge cap.

Louise - Long Beach
Removal of 2 existing layers. Installation of new drip edge, ice and water, synthetic underlayment, starter strips, and Malarkey Ecoasis Nex.

Toscanini - Rancho Palos Verdes
2 layer tear off. Installation of new drip edge, ice and water barrier, synthetic underlayment (UDL-50), new Owens Corning Duration Cool Plus and ridge cap.

9th St - Santa Monica
Remove existing rock build up roof. Install 1" ISO and install JM TPO 60 mil single ply.

San Francisco - Long Beach
Remove existing damaged wood, skylights, and roof. Replace damaged plywoods and install new granulated torch down.

Val Verde - Long Beach
Remove 2 layers of wood shake, install new radiant barrier plywood, and Malarkey Ecoasis Nex shingles.

Corydon St. - Compton
Remove 1 layer of wood shake, and 3 layers of asphalt shingles. Iinstall new radiant barrier plywood, and install Owens Corning Duration Cool shingles.
3 layer tear off. Installation of new drip edge, ice and water barrier, synthetic underlayment, new Certainteed Landmark Solaris and ridge cap.

Tia Juana - Laguna Beach
Remove existing rock build up roof and 1" ISO. Install 2.5" ISO and install Certainteed granulated torch down.
Tile relift; Installation of new double underlayment and reinstallating existing tile.

Bryant Dr - Huntington Beach
Installation of new drip edge, ice and water barrier, synthetic underlayment, new Certainteed Landmark Solaris shingles and ridge cap.

Wilson St - Costa Mesa
Tear off of 1 layer of shingles. Installation of new drip edge, ice and water barrier, synthetic underlayment, new Malarkey Ecoasis Nex and ridge cap.

Beach St - Watts
Tear off of 4 layer of shingles, and 1 of wood shake. Install new 1/2" radiant barrier plywood. Install new drip edge, ice and water barrier, synthetic underlayment, and new Owens Corning Duration Cool and ridge cap.

66th St - Los Angeles
Tear off of 2 layer of shingles. Install new drip edge, ice and water barrier, synthetic underlayment, and new Certainteed Landmark Solaris and ridge cap.

Grevillea - Lawndale
Tear off of 1 layer of shingles. Install new drip edge, ice and water barrier, synthetic underlayment, and new Malarkey Ecoasis Nex and ridge cap.

Whittier - Groveside
Tear off of 3 layers of shingles. Install new 1/2" radiant barrier plywood. Install new drip edge, ice and water barrier, synthetic underlayment, and new Certainteed Landmark Solaris and ridge cap.

Westminister - Beach Blvd
Remove existing sheet metal roof with silicone coating. Install 1.5" ISO and install TPO single ply 60 mil.

Baruna Ln - Huntington Beach
Remove existing rock build up roof. Install 1.5" ISO and install TPO single ply 60 mil.

Long Beach - Doidge
Remove 5 layers of granulated torch down. Install new glass base, smooth and polyfresko torch down.

Redlands - Center Ave
Install drip edge, ice and water barrier, synthetic underlayment, and GAF HDZ RS shingles matching existing roof on ADU.

Yorba Linda - Mt Hood
Install double 30 lb underlayment, and duralite saxony 600 tile matching existing home with 2 low profile vents.

Torrance - Andreo
Install drip edge, ice and water barrier, synthetic underlayment, and Certainteed Landmark Solaris shingles matching existing roof on ADU.

Long Beach - Lime St
Remove 2 layers of existing roof. Install a custom cricket system to help with water flow. Install base sheet, smooth and cool roof torch down.

Long Beach - Rose
Remove 2 layers of existing roof. Install 1/2" radiant barrier plywood. Install synthetic underlayment. Install Owens Corning DC shingles.

Long Beach - Caspian
Install shingles on top of existing roof. Install drip edge, synthetic underlayment. Install Owens Corning DC shingles.

Long Beach - Linares
Remove existing wood shingles roof. Install 1/2" radiant barrier plywood, install new edge metal with synthetic underlayment/ice and water. Install new Owens Corning DC shingles.

Los Angeles - Eastborne
Remove existing tile. Install new boral tile seal underlayment. Re install existing tile with mortar mix under tile.

RPV - Pirate Dr.
Install drip edge, ice and water barrier, synthetic underlayment, and GAF HDZ RS charcoal shingles.

Whittier - Firebird
Remove 1 layer of shingles. Install drip edge, ice and water barrier, synthetic underlayment, and Malarkey Moonlit black shingles.

Long Beach - MLK
Remove 1 layer of existing roof. Install drip edge, ice and water barrier, synthetic underlayment. Install Owens Corning DC shingles.

Long Beach - Rose
Remove 1 layer of existing roof. Install drip edge, ice and water barrier, synthetic underlayment. Install Owens Corning DC shingles.

Long Beach - Rose
Remove 1 layer of existing roof. Install drip edge, ice and water barrier, synthetic underlayment. Install Owens Corning DC shingles.

Lakewood - Spahn
Install shingles on top of existing roof. Install drip edge, synthetic underlayment. Install Owens Corning DC shingles.

Whittier - Grady
Install shingles on new ADU. Install drip edge, synthetic underlayment. Install Certainteed Landmark Solaris shingles.

Los Angeles - Crest Dr.
Remove existing tile. Install new boral tile seal underlayment. Re install existing tile with mortar mix under tile. Install elastoflex underlayment. Install smooth on the entire field, install new polyfresko torch down.

Long Beach - Gundry
Remove existing tile. Install new boral tile seal underlayment. Re install existing tile. Install elastoflex underlayment. Install new polyfresko torch down on the entire field.