top of page
2.png

PROJECTS

OUR PROJECT CATEGORY

IMG_4467.HEIC

SHINGLES

IMG_3356.HEIC

SINGLE PLY

Photo_6619219_DJI_83_jpg_8999407_0_202212916440_photo_original.jpg.jpg

TORCH DOWN

IMG_4447.HEIC

TEAR-OFF

IMG_4187.HEIC

REPAIRS

IMG_3775.jpg

MAINTENANCE

IMG_3778.HEIC

COATING

IMG_3737.jpg

WATERPROOF

SOME OF OUR LATEST WORK

At Enriquez Roofing Inc., we help individuals and businesses with our top of the line services. Since starting out, we’ve taken on a variety of projects, always providing personalized attention to ensure precision and satisfaction with all of our work. Take a look at our recent projects and get in touch today to start your own.

dji_fly_20221208_141104_305_1670651277227_photo.JPG

RPV - Pirate Dr.

Install drip edge, ice and water barrier, synthetic underlayment, and GAF HDZ RS charcoal shingles.

​

Coming Soon Neon Light

Yorba Linda - Mt Hood

Install double 30 lb underlayment, and duralite saxony 600 tile matching existing home with 2 low profile vents.

Coming Soon Neon Light

Whittier - Firebird

Remove 1 layer of shingles. Install drip edge, ice and water barrier, synthetic underlayment, and Malarkey Moonlit black shingles.

Photo_6619185_DJI_49_jpg_7749904_0_2021121512186_photo_original.jpg.jpg

McCully -
Chino

Re-roof with 1" ISO and install JM TPO 60 mil single ply.

​

Photo_6619199_DJI_63_jpg_10755748_0_20211217155238_photo_original.jpg.jpg

Coveview Dr. - Rancho Palos Verdes

Remove flat tile and add shingles for Tesla installation.

​

66131189-7178-467E-935A-500A07710115.jpg

Comiso Way - Rancho Cucamonga

Customer was tired of having to replace broken tiles so granulated torch down was installed.​

IMG_4466.jpg

Hill St - Long Beach

Remove 2 existing layers, replace damaged plywood, install UDL 30, and Owens Corning Mountainside as a final finish.

Photo_6619230_DJI_94_jpg_7068529_0_20222295030_photo_original.jpg.JPG

Benson -Chino

Re-roof with 1" ISO and install JM TPO 60 mil single ply.

​

 

Photo_6619226_DJI_90_jpg_9143874_0_202221113030_photo_original.jpg.JPEG

Venice - California

Install new Owens Corning Duration Cool (Sierra Gray) and GAF Timberline HDZ (Birchwood)

​

Photo_6619219_DJI_83_jpg_8999407_0_202212916440_photo_original.jpg.jpg

South Gate - Alexander

Shingle overlay; Install synthetic underlayment, new edge metal, and Certainteed Landmark Solaris

​

​

Photo_6619233_DJI_97_jpg_9049911_0_2022214115940_photo_original_edited.jpg

South Gate - Santa Ana

Install ice and water barrier on roof and S tile as a final finish.

 

​

​

72581920-A130-4028-AAEF-3DC53F3F9699.jpeg

Whittier - La Vela

Double underlayment installed with Certainteed Presidential Solaris installed as a final layer. Skylights properly flashed and installed.

 

imagejpeg_0_edited.jpg

Northridge
- Calahan

Tile tear off. Installation of new drip edge, ice and water barrier, synthetic underlayment (UDL-50), new Owens Corning Duration Cool Plus and ridge cap.

​

72AC15DF-42E6-4B47-8472-3624935D91F6.jpeg

Hermosa Beach - Hermosa Ave

Install 1/4" densdec with screws and insulation plates. Then install TPO 60 mil single ply as a final finish.

​

 

​

imagejpeg_0.JPG

Candlewood
- Lakewood

Base sheet installation with metal cap nails, 1/4" strip of smooth installed around perimeter and flashings, granulated torch down installed as a final layer.

 

17911460606420080.jpg

Irvine -
Church Sheds

New drip edge metal installed, synthetic underlayment, and starter strips. Malarkey Ecoasis Nex installed as a final layer with ridge cap.

​

​

18044634676319552.jpg

Louise -
Long Beach

Removal of 2 existing layers. Installation of new drip edge, ice and water, synthetic underlayment, starter strips, and Malarkey Ecoasis Nex.

 

18287735614031474.jpg

Toscanini - Rancho Palos Verdes

2 layer tear off. Installation of new drip edge, ice and water barrier, synthetic underlayment (UDL-50), new Owens Corning Duration Cool Plus and ridge cap.

 

Photo_6619361_DJI_225_jpg_7849523_0_202272017252_photo_original.JPG

9th St -
Santa Monica

Remove existing rock build up roof. Install 1" ISO and install JM TPO 60 mil single ply.

​

​

IMG_9703.HEIC

San Francisco -
Long Beach

Remove existing damaged wood, skylights, and roof. Replace damaged plywoods and install new granulated torch down.

 

Photo_6619328_DJI_192_jpg_9077060_0_2022715131618_photo_original.JPG

Val Verde -
Long Beach

Remove 2 layers of wood shake, install new radiant barrier plywood, and Malarkey Ecoasis Nex shingles.

​

 

dji_fly_20220922_092016_259_1663863925310_photo.JPG

Corydon St. -
Compton

Remove existing rock build up roof. Install 1" ISO and install JM TPO 60 mil single ply.

​

​

dji_fly_20220831_120052_250_1661996929245_photo.JPG

Tia Juana -
Laguna Beach

Remove existing damaged wood, skylights, and roof. Replace damaged plywoods and install new granulated torch down.

​

dji_fly_20220920_085252_256_1663731830757_photo.JPG

Bryant Dr - Huntington Beach

Installation of new drip edge, ice and water barrier, synthetic underlayment, new Certainteed Landmark Solaris shingles and ridge cap.

Photo_6619371_DJI_235_jpg_8172349_0_202281103430_photo_original.JPG

Wilson St - Costa Mesa

Tear off of 1 layer of shingles. Installation of new drip edge, ice and water barrier, synthetic underlayment, new Malarkey Ecoasis Nex and ridge cap.

​

dji_fly_20221005_133858_273_1665374128131_photo.JPG

Beach St - Watts

Tear off of 4 layer of shingles, and 1 of wood shake. Install new 1/2" radiant barrier plywood. Install new drip edge, ice and water barrier, synthetic underlayment, and new Owens Corning Duration Cool and ridge cap.

dji_fly_20220924_131754_266_1664596912387_photo.JPG

66th St - Los Angeles

Tear off of 2 layer of shingles. Install new drip edge, ice and water barrier, synthetic underlayment, and new Certainteed Landmark Solaris and ridge cap.

​

dji_fly_20221109_092908_286_1668746981262_photo.JPG

Grevillea -
Lawndale

Tear off of 1 layer of shingles. Install new drip edge, ice and water barrier, synthetic underlayment, and new Malarkey Ecoasis Nex and ridge cap.

​

​

IMG_3761.jpg

Whittier -
Groveside

Tear off of 3 layers of shingles. Install new 1/2" radiant barrier plywood. Install new drip edge, ice and water barrier, synthetic underlayment, and new Certainteed Landmark Solaris and ridge cap.

dji_fly_20221104_090932_283_1668746977618_photo.JPG

Baruna Ln - Huntington Beach

Remove existing rock build up roof. Install 1.5" ISO and install TPO single ply 60 mil.

​

​

​

IMG_3198.JPG

Westminister -
Beach Blvd

Remove existing sheet metal roof with silicone coating. Install 1.5" ISO and install TPO single ply 60 mil.

 

68988168298__6F778B7D-4137-47D7-A520-98DE3988868F.fullsizerender.jpeg

Long Beach -
Doidge

Remove 5 layers of granulated torch down. Install new glass base, smooth and polyfresko torch down.

​

dji_fly_20221209_092114_310_1670651268946_photo.JPG

Redlands -
Center Ave

Install drip edge, ice and water barrier, synthetic underlayment, and GAF HDZ RS shingles matching existing roof on ADU.

Coming Soon Neon Light

Torrance - Andreo

Install drip edge,  ice and water barrier, synthetic underlayment, and Certainteed Landmark Solaris shingles matching existing roof on ADU.

dji_fly_20221213_145508_328_1670972341331_photo.JPG

Long Beach - MLK

Remove 1 layer of existing roof. Install drip edge,  ice and water barrier, synthetic underlayment. Install Owens Corning DC shingles.

​

dji_fly_20230203_111458_398_1675452027986_photo.JPG

Long Beach - Lime St

Remove 2 layers of existing roof. Install a custom cricket system to help with water flow. Install base sheet, smooth and cool roof torch down.

temp_image_for_default_share 3.png

Long Beach - Rose

Remove 1 layer of existing roof. Install drip edge,  ice and water barrier, synthetic underlayment. Install Owens Corning DC shingles.

temp_image_for_default_share.png

Long Beach - Rose

Remove 2 layers of existing roof. Install 1/2" radiant barrier plywood. Install synthetic underlayment. Install Owens Corning DC shingles.

temp_image_for_default_share 2.png

Long Beach - Rose

Remove 1 layer of existing roof. Install drip edge,  ice and water barrier, synthetic underlayment. Install Owens Corning DC shingles.

Coming Soon Neon Light

Long Beach - Caspian

Install shingles on top of existing roof. Install drip edge, synthetic underlayment. Install Owens Corning DC shingles.

​

dji_fly_20230123_162722_383_1675452059275_photo.JPG

Lakewood - Spahn

Install shingles on top of existing roof. Install drip edge, synthetic underlayment. Install Owens Corning DC shingles.

​

dji_fly_20230131_124216_384_1675452050882_photo.JPG

Long Beach - Linares

Remove existing wood shingles roof. Install 1/2" radiant barrier plywood, install new edge metal with synthetic underlayment/ice and water. Install new Owens Corning DC shingles.

Gardena - Harvard.JPG

Gardena - Harvard

Tear-off existing roof. Install new 2x2 edge metal. Install ice and water and synthetic underlayment with Owens Corning Duration Cool.

IMG_6745.JPG

Whittier - Grady

Install synthetic underlayment with Certainteed Landmark Solaris shingles on this new addition.

Carson - 220th_edited.jpg

Carson - 220th

Tear-off existing roof. Install new 2x2 edge metal. Install ice and water and synthetic underlayment with Owens Corning Duration Cool.

Azusa - Calvados.JPG

Azusa - Calvados

Tear-off existing roof. Install new 2x2 edge metal. Install ice and water and synthetic underlayment with Owens Corning Duration Cool.

Long Beach - Avalon.JPG

Long Beach - Avalon

Remove existing tile. Install new tile seal underlayment with new saxony 600 tile.

Compton - Wilmington.JPG

Compton - Wilmington

Tear-off existing roof. Install new 2x2 edge metal. Install ice and water and synthetic underlayment with Owens Corning Duration Cool. Install elastoflex on flat roof and polyfresko as a final finish.

Lakewood - Harvey.JPG

Lakewood - Harvey

Tear-off existing roof. Install new 2x2 edge metal. Install ice and water and synthetic underlayment with Owens Corning Duration Cool.

Long Beach - Gundry.JPG

Long Beach - Gundry

Install elastoflex underlayment on the entire flat field. Install polyfresko granulated torch down as a final finish. Install double 30 lb on tile and reinstall tile.

Long Beach - Eucalyptus.JPG

Long Beach - Eucalyptus

Install shingles on top of existing roof. Install drip edge, synthetic underlayment. Install Certainteed Landmark Solaris shingles. Install elastoflex underlayment. Install polyfresko as a final finish.

Long Beach - Petaluma.JPG

Long Beach - Petaluma

Tear-off existing roof. Install new 2x2 edge metal. Install ice and water and synthetic underlayment with Owens Corning Duration Cool.

Los Angeles - Eastborne.JPG

Los Angeles - Eastborne

Remove existing underlayment. Install tile seal underlayment and reinstall tile.

​

Los Angeles - Crest Dr.JPG

Los Angeles - Crest Dr.

Remove existing roof. Install new elastoflex underlayment. Install new polyfresko underlayment. Install tile coping.

Pasadena - Ramona.JPG

Pasadena - Ramona

Tear-off existing roof. Install new 2x2 edge metal. Install ice and water and synthetic underlayment with Owens Corning Duration Cool.

Pomona - New York.JPG

Pomona - New York

Remove existing roof. Install new 1" ISO mechanically fastened. Install new TPO single ply.

Manhattan Beach - 44th St.JPG

Manhattan Beach - 44th

Remove existing roof. Install new plywood on entire roof. Install new 1" ISO mechanically fastened. Install new TPO single ply.

Rancho Palos Verdes - Catalina.JPG

Rancho Palos Verdes- Catalina

Remove existing tile. Install double synthetic underlayment with lightweight Eagle S tile.

Torrance - Catalina.JPG

Torrance - Catalina

Install synthetic underlayment with Owens Corning Duration Cool Night sky shingles on this new addition.

CONTACT US

Cipriano Valentin (English)

Phone: 562-308-8034

Email: Tony@enrqzroof.com

​

Jaime Enriquez (Spanish)

Phone: 562-595-2061

OPENING HOURS

Monday - Friday - 6:30 AM - 5:00 PM

Saturday - 8:00 AM - 3:00 PM

Sunday - Closed

CONNECT WITH US

Lic #1081473

© 2023 By Enriquez Roofing, All Rights Reserved.

bottom of page